This project comprised of a nursery school extension. Doubling the size of the existing building, which included a new baby, pre toddler, toddler and pre schools areas.
The scope of work included the following items:
1. Enabling works and demolition of existing building.
2. Groundworks to form substructures and service yard, with new retaining walls to accommodate revised levels
3. Steel portal frame structure
4. External roofing and cladding
5. External and internal doors
6. Internal finishes
7. Mechanical and Electrical installations
8. Service and drainage connections